六安流水线设备:三流道倍速链使用注意事项

六安流水线设备:三流道倍速链使用注意事项


1,六安流水线设备:三流道倍速链注意事项

2,六安流水线设备:三流道倍速链线体应保持清洁,定期擦洗;


3,六安倍速链生产线 :三流道倍速链无故不能接触各部位的行程开关,以免乱PLC程序,电气箱由专业人员操作。

,4,六安倍速链输送线:三流道倍速链不允许任意松动线体内的所有紧固件,机械传动件等。


5,应保持差速链的清洁;


6,定期检查减速机润滑情况;


六安流水线设备:三流道倍速链每一个月检查差速链的松紧情况,如发现差速链条过松,应打开机架(双面贴塑板)顺时针转动涨紧座丝杆,以达到输送链的更佳松紧度;


六安流水线设备:三流道倍速链每两个月检查顶升移行链条松紧情况,如发现链条过松,应打开机移行顶部盖板;


气源三联件顺时针转动三联件中间的塑料阀门,以达到所需气压(约0.5mpa),通气前油杯加满40#机油,开机前应把滤水杯里的水放净;


气管上的挂钩是用来吊挂气动螺刀用,不要吊挂其它物品,以免挂钩变形;


中间工艺板用来夹装各工序、工艺图纸用,应保持清洁;


中间搁板用来放置各测试仪表,请不要放置过重物品;


如过一段时间开机生产时,应把各工装板堆叠放置整齐,以免工装板变形。


Assembly line equipment: precautions for the use of three-runner double-speed chain

1. Assembly line equipment: precautions for three-runner double-speed chain

2. Assembly line equipment: The three-channel double-speed chain body should be kept clean and scrubbed regularly;

3. Double-speed chain production line: The three-channel double-speed chain cannot touch the travel switches of each part for no reason, so as not to mess up the PLC program. The electrical box is operated by professionals.

,4, double-speed chain conveyor line: the three-channel double-speed chain does not allow any loosening of all fasteners, mechanical transmission parts, etc. in the line body.

5. The differential chain should be kept clean;

6. Regularly check the lubrication of the reducer;




Assembly line equipment: check the tightness of the differential chain every month for the three-runner double-speed chain. If you find that the differential chain is too loose, you should open the frame (double-sided plastic board) and turn the tension seat screw clockwise to reach the conveyor chain. The best tightness;

Assembly line equipment: check the tightness of the lifting and moving chain every two months for the three-runner double-speed chain. If the chain is found to be too loose, the top cover of the moving machine should be opened;

Air source triple piece rotates the plastic valve in the middle of the triple piece clockwise to reach the required air pressure (about 0.5mpa), fill the oil cup with 40# oil before ventilating, and drain the water in the filter cup before starting the machine;

The hook on the trachea is used to hang the pneumatic screwdriver. Do not hang other objects to avoid deformation of the hook;

The intermediate process board is used to clamp each process and process drawings, and it should be kept clean;

The middle shelf is used to place the test instruments, please do not place heavy objects;

If the production is started after a period of time, the tooling boards should be stacked neatly to avoid deformation of the tooling boards.